project:
high speed rail line, santo ovídio station
(design-build international competition)
client:
infraestruturas de portugal, s.a.
location:
vila nova de gaia, portugal
date:
2024
intervention area:
72 800 m2
architecture:
adriano pimenta, noarq, nuno brandão costa
collaborators:
andré oliveira, anna riin velner, eduardo kenji, gaia ferraris, giulio dalle vedove, joão francisco santos, mário vilela, nuno afonso, nuno gonçalves, alexandre azevedo
functional program and station dimension:
pedro costales (typsa)
underground station engineering management:
félix lópez (typsa)
tunnels and galeries
adolfo tejada (typsa)
wells structure:
xavier torelló (typsa)
ventilation:
ignácio del rey (typsa)
engineering coordinator:
rui furtado, marisa ferreira (afaconsult)
structural engineer:
rodrigo castro, márcio teixeira, cláudio faria (afaconsult)
road design:
elza mendes (proporto)
landscape design:
rita guedes
hydraulic engineer:
paulo silva, tiago lopes, jorge machado (afaconsult)
electrical engineer:
maria da luz santiago, raúl serafim, raúl silva, ricardo campinho (afaconsult)
mechanical engineer:
david garrido, carlos almeida (afaconsult)
acoustic engineer:
octávio inácio (inacoustics)
sinaletic design:
miguel palmeiro (united by)
3d:
fusão
contractor:
sacyr somague, nge, dst s.a., grupo aca